Excavation, drainage and treatment plants

We carry out excavation work, lay foul and storm water drainage, and install small treatment plants. We see the job through — from digging and laying to backfilling and restoring the surface above it.

What it covers

Work below the surface

What lies underground is the hardest thing to fix later. That is why we do this work in one go and finish it so that the surface above is tidy again.

Excavation work

Digging for foundations, connections, trenches and landscaping — to the agreed extent and depth.

Foul water drainage

Laying foul water drainage with correct falls and connections, to the public network or to a treatment plant.

Storm water drainage

Taking rainwater away from roofs and paved surfaces — separate from foul water, to where it does no harm.

Treatment plants

Installing small wastewater treatment plants, including the excavation, bedding and connection of inlet and outlet.

Our approach

We do not leave a building site behind

Finished, not abandoned

We backfill the trench, level the ground and restore the surface. Lawns and paving we can take on ourselves — that is our line of work anyway.

Two separate systems

We keep foul and storm water separate, as they must be — not together in one trench and not one into the other.

Agreed in advance

We agree the scope, access and timing before we start. If the ground throws up a surprise, we talk about it right away — not after the work is done.

Completed work

From our projects

FAQ

Excavation and drainage — questions

Do you look at the site first?

Yes. With excavation, access often matters more than the digging itself — we check how we get to the spot, what is in the ground and where the spoil goes. Only then do we prepare a quote.

Do you restore the surface after backfilling?

Yes, and that is why clients call us for both. After backfilling we level the ground and can finish the surface right away — with planting, a new lawn or paving. So you are not looking for a second contractor to finish the job.

Do I need a permit for a treatment plant?

That depends on the location, the size and where the outlet runs — the rules are set by the municipality or the network operator. Tell us where the work is and we will go through what needs arranging in your case before we start.

When is the best time to dig?

We dig all year round, except when the ground is frozen or so waterlogged that getting to it would damage the surroundings. If time is short, we agree on the order of works.

Need excavation or drainage?

Describe the location and the scope — we will look at the site and prepare a quote.